One should never read too much into politicians’ rhetoric, but it was rather good to see comments from Premier-elect Daniel Andrews on Monday in free commuter newspaper MX: “Yes, we need better local roads and yes, we do need to invest in that infrastructure, but the transformational infrastructure is a better public transport system. One ... [More]
Tag: PTV

High-frequency trains (all day, every day) are critical for any big city, to ensure large numbers of people can get around quickly and easily. As a PTUA study found some years ago, Melbourne is one of the few big world cities that doesn’t have them. To draw an analogy, it’s as if outside peak hour, ... [More]
Since our last exciting episode, PTV have made a number of revisions to the draft rail map. Here’s the latest version: (Click to see it larger, and uncropped) As I said back in April, I really like this new design, which better represents how the rail network operates. Changes since that earlier draft that I ... [More]
Those LED automated signs on station platforms are known in the biz as Passenger Information Displays, or PIDs. In recent months they’ve been installed at a lot of stations along the Frankston line. They’re handy because they provide you with realtime departure information, without having to press the Green Button, which often doesn’t work or ... [More]
Do I win a prize? Following on from my photos a couple of years ago of a train, tram and bus in one shot, I’ve managed to get another (at the same location) of the three of them in the PTV livery. Common livery is not the most important thing in a public transport network, ... [More]
The July 27th public transport network changes are pretty big. Some of the information is a bit vague, so here are some points I’ve gleaned from looking around, as well as chatting to Transdev, who run a lot of the bus routes that are changing. V/Line The big thing in rail is V/Line trains from ... [More]
The metro rail tunnel has been renamed again. What has been at various times “Metro 1+Metro 2”, “the Metro Tunnel”, and the “Metro Rail Capacity Project” is now “Melbourne Rail Link”. The plans for the revised version are not as bad as first thought. The Frankston line will run from South Yarra to Domain and ... [More]
PTV’s plan for a frequent network
We could have a vastly more usable PT network; PTV has a plan. It just needs funding.