I and others have been known to call the East-West Link tunnel a zombie project — you can fight it off (as was done in the 70s) but it will never truly die.

Last year at the launch for the Trains Not Tollroads campaign, Dr Sophie Sturup gave a great speech on mega projects. She made some really good points about how these multi-billion dollar mega projects get up, and about EWLink specifically.

She’s given variations on the speech elsewhere… these are summary notes from a similar speech given to the Carlton Residents Association meeting on 14 March this year. Reproduced with permission. Hopefully they’re as compelling in written form as they are spoken.

Victorian government advertising their "second river crossing"

What is East – West?

East – West project is a mega project and a road project. That is why my research on the mentalities of mega projects has some relevance to it.

From my research, a mega projects have a couple of salient features:

1. Power is in mega projects is based on sovereignty – which is to say that these projects rest on the fact that someone with the authority to do so has declared that they will be done. Thus the legitimacy of the project is directly linked to the people who said it would happen. To question the legitimacy of the project is to question the right of the ‘sovereign’ to decide things, and this is generally confused with the legitimacy of the sovereign at all. The other thing about this is that everyone operating in the project is able to do so because of the sovereign decision. Thus they cannot question the project’s legitimacy either without removing their ability to operate in the project at all.

2. Process in the project is dominated by project thinking. Project thinking is about deciding what needs to be done, and then creating boundaries around that so that it cannot be interfered with. That is, making the project manageable. This is one of the reasons why consultation looks pretty weird in these projects. By the time the community gets talked to about the project, the project has already been decided upon (see 1) and the fact that it is happening cannot be questioned. The project thinking means that the only questions of relevance are those which will ‘improve’ the project either by reducing its costs or reducing the impact on the community. And the reduction of impact on the community can only be accommodated if it reduces costs or the time taken in the project (which also costs money).

3. Mega projects do not come about as a result of identification of a problem, and then the application of a solution. The process of creating a mega project includes the problem and solution being jointly conceived. This happens as the stories or rationales for the project, and what can be conceived as being done jointly emerge – this lets you get at the next item on this agenda which is why has this project happened?

EWLink interchange to Citylink at Royal Park

What is the project for?

The rationale for mega projects needs to make sense if the project is going to be a success. In this sense East-west is a failure waiting to happen. It won’t be a failure because it isn’t built on time and on budget. The Linking Melbourne Authority has the competence to ensure that that happens. Unfortunately that isn’t what constitutes success in mega projects.

One of the key findings of Omega Project 2, a research project looking at 32 mega transport projects across 10 countries (run by the Omega Centre, Bartlett School of Planning, University College London and funded by Volvo Education and Research Foundation (VREF) was that mega projects are context specific and where they don’t have an open and exploratory relationship with the context they work out as a failure.

My own research which focused the Australian cases of Melbourne’s City Link, the Perth to Mandurah Railway and Sydney’s Cross City Tunnel, found in Australia we define success as occurring when projects meet their stated outcomes (in transport projects that means traffic numbers) and the companies which build them are successful in financial terms (which of course is related to the traffic numbers being correct).

The reason that East – West will be a failure is therefore that the stated goals are:

a) Fluffy

b) Not agreed on

c) Based on inducing traffic, so there won’t look like any kind of benefit. For example the modelling shows that the traffic in Alexandra Parade will reduce a tiny bit briefly, but be back at the same level by 2020 2030. This will not look like 30% reduction in traffic on the Eastern Freeway, unless of course the traffic numbers projected to be induced doesn’t’ happen in which case there won’t be enough traffic to meet that modelled expectation. Similarly the changes on Bell St or reduced traffic on M1 will not be noticeable by the people who are near enough to the tunnel to make a difference.

The fluffiness of the dialogue on the purpose of the project is thus such that if they succeed in getting the numbers they predict the Eastern Freeway will be horrible and the numbers on Alexandra Parade the same so the predictions will be wrong because there will not be a 30% reduction in traffic. Or alternatively they won’t get the numbers of induced traffic in which case the tunnel will be seen as a failure because it isn’t able to pay for itself (and therefore wasn’t really needed).

This leads to the conclusion that whatever the stated objectives in the media (primarily ‘reduce congestion’) that probably isn’t what it is really for. So what is indicated in the objectives which isn’t quite so fluffy?

The objectives which appear to have teeth are:

a) Induce traffic onto the eastern freeway – in the form of trucks. This makes sense. After turning the section of Freeway between the City Link tunnels and the Bolte Bridge into freeway spaghetti, it is not surprising that B-double truck drivers are less than happy with that route. City Link changed the location of key freight logistics hubs and helped the development of a major one out at Lyndhurst/Dandenong. East-Link was built to facilitate this development (among other things). However the trucks (which represent several cars in terms of counting traffic) have failed to use the road to come to the Eastern Freeway. Why? Because there is nowhere for them to go when they get there. Thus one logic for this road which makes sense is to create a new link for trucks trying to access the port from Lyndhurst. This will have the effect of reducing the cost to the state of East-Link (because of increased toll revenue), and thus obliquely help pay for the East-West. It will also keep the truck moguls happy, and reduce the truck traffic on the M1 (which is of course Liberal heartland). It is possible to observe this as a source of equity, it will share the truck traffic, and hence the enormous danger to health and life they present, around the city more. Bringing large numbers of B-doubles and their pollution into those eastern suburbs which are almost truck free.

b) As speculation, another source of possible logic for East-West is to grant access to the Liberal swinging voters in the east to some of the jobs that are coming from the west in particular the Airport. Obviously this isn’t one of the things discussed widely in the media. This would explain why ‘improving access to the airport for those in the eastern suburbs’ might make a type of sense. Certainly spending $8 billion on a tunnel so “George” can go to the airport twice a year more comfortably doesn’t.

c) A third logic which makes sense is that this project is getting funded by the Federal government and there is no money on the table for anything else. It is against all logic in public service not to take up money when it is offered even when it only represents 18% of the cost of $8 billion.

d) Finally the logic of keeping car driving alive and well in the city is also relevant here. Tony Abbott has clearly expressed the view in various publications including Borderline what in his view we will have failed as a society if freely available car transport isn’t provided.

The other reasons why the road is occurring are largely borrowed from the Eddington report which was based on dealing with an accessibility and equity problem that was real – the issues of the disadvantaged West and the actually congested Westgate Bridge. The rationale in Eddington doesn’t make much sense for the East-West stage 1 because it comes from a study which had the centre of it’s study area in Laverton, and only at the very edge reached the end of the Eastern Freeway. An example of such nonsense statements is the one which came out in the second news letter from LMA (before the second half of East West was announced) which stated that the project was required because by 2031 almost 440,000 cars would be crossing the Maribyrnong by road (none of course would be in the East-West stage 1 as that project does not cross the Maribyrnong).

Why this project won’t die easily

One of the main reasons is that both sides of politics have a vested interest in maintaining the legitimacy of their right to make sovereign decisions. The major parties like to make decisions on these things and then deliver them it removes all that messy business of democracy. If the Labor Party was to revoke the contracts it would not only be expensive by they would essentially be admitting that these things should only happen after consultation (which is likely to make it very difficult to get anything done).

Secondly the Labor party has linked their policy to jobs. Because of the time it takes to get large projects up and running, they will not meet their targets without East-West. Therefore they will not revoke contracts unless forced.

Why do I care?

I believe that we probably do have an infrastructure crisis in this country. Apart from new projects much of our infrastructure is aging and needs to be replaced. Also I believe we need to massively retrofit our cities for sustainability and even to just accommodate more people. We probably need mega projects to do that.

The problem with this project is that every failed mega project inflates the cost of the next one. You can already see that with the massive cost increases between Cross City Tunnel, the Brisbane tunnels and this project.

The other problem that this project exposes is the degree to which government has come to the conclusion that the community cannot be consulted with. I don’t believe this is just ideology, it has also come from bitter experience. If the community is going to insist on being consulted, then it is up to us to figure out how to do that in ways which are productive.

More reading/viewing:

By Daniel Bowen

Transport blogger / campaigner and spokesperson for the Public Transport Users Association / professional geek.
Bunurong land, Melbourne, Australia.
Opinions on this blog are all mine.

2 replies on “#EWLink: What is it? What is it For? Why it won’t die easily? – Sophie Sturup on mega projects”

Good post Daniel. East West Link will not solve congestion. Evidence was given to the Planning Assessment Committee that 10 years after East West Link is build, it will be at capacity with traffic at a crawl. All this at a cost of $8billion which will restrict Victoria’s capacity to build any other major public infrastructure projects in the future. Powerful vested interests appear to be put ahead of the public interest.

Comments are closed.