Photos from ten years ago

Old photos from July and August 2016

Trying my best to catch up on my ten year old photo posts… almost all of the photos from these two months are of the level crossing removals which were going full steam ahead in my neighbourhood in Bentleigh.

By July, they had dug out the trench for the new rail line under the roads, and were starting to fill it back in again. Daytime:

Bentleigh station trench being built out during level crossing removal works, July 2016

Night:

Bentleigh station trench being built out during level crossing removal works, July 2016

One night I got invited to see the works up close

Daniel touring the trench at Bentleigh station during level crossing works, July 2016

This view from the Brewer Road bridge from early July shows just how much was going on. (Click to zoom in)

Bentleigh/Mckinnon/Ormond level crossing works 5/7/2016

24/7 works resulted in some local businesses, especially food shops, running 24/7 too

24/7 bakery during level crossing works in Bentleigh, July 2016

In daytime the construction drew considerable numbers of onlookers

Watching the level crossing works at Bentleigh, July 2016

At Ormond, they were building the value capture deck, but until late July, nobody knew it was there or what it was.

Building the "value capture" deck at Ormond station, July 2016

Working on the signalling

Working on the signalling during Bentleigh/McKinnon/Ormond level crossing removal works, July 2016

The night before McKinnon station would reopen, they were still putting on finishing touches.

McKinnon station about to open, 31st July 2016

…and it opened on time

McKinnon station on opening day, 1st August 2016

…and featured in a video published the same day by local MP Nick Staikos… if you look very carefully you might be able to spot yours truly in it.

Works at Ormond and Bentleigh (shown here) continued:

Bentleigh station under construction, July 2016

Not all local businesses were appreciative of the project.

Not enjoying the level crossing removals, July 2016

Meanwhile, early works for the Caulfield to Dandenong level crossing removals were getting started.

Murrumbeena station prior to level crossing removal works, July 2016

The fencing along the line was a sign that things were about to change.

Murrumbeena station preparation for crossing removals, July 2016

This photo from Carnegie shows the change to the overhead wiring, using structures that would fit underneath the soon-to-be-built skyrail.

Carnegie station preparation for crossing removals, August 2016

Elsewhere, life went on. Here’s a view of Market Street, with a train, tram and bus all passing. The safety zone in the foreground has since been removed, along with another stop, but trams still suffer long delays between Flinders Street and Collins Street.

Train, tram and bus viewed from Market Street, Melbourne, August 2016

The Melbourne Bike Share scheme ran from 2010 to 2019, arguably killed by the Free Tram Zone. Here’s a helmet dispenser at Southern Cross Station… looking empty.

Melbourne Bike Share helmet dispenser, August 2016

By Daniel Bowen

Transport blogger / campaigner and spokesperson for the Public Transport Users Association / professional geek.
Bunurong land, Melbourne, Australia.
Opinions on this blog are all mine.

One reply on “Old photos from July and August 2016”

The delays to the north bound 58 tram is worse than the linked video shows. If it began at the Casino stop, it would show the tram often sitting through a set of red lights where the road turns left from the bridge towards William Street, move forward to the Flinders Street stop, arriving just as the lights there turn red. Then if there is a bus turning right, it will activate its turn arrow before the tram gets the green light. If there is a single car in front of the tram turning from Flinders Land into William Street, there isn’t an arrow to move traffic and the tram to turn, the tram often having to wait for the ‘T light’ after the facing traffic lights turn red. Even if the tram reaches the same lights without traffic in front, the ‘T light’ before the green phase rarely seems to work. It is an absolute disgrace and I think with decent tram priority, three or so minutes could be trimmed from less than a one kilometre of travel.